1
 BLOOMSBURG
FEASIBILITY STUDY

Recommended Plan
  •  o  Fringe alignment provides Agnes-level protection from the Susquehanna River
  •      and 100-yr level protection from Fishing Creek.  For Fishing Creek, the 100-yr
  •      storm event is more damaging than the Agnes event.


  •  o  Town-side project consists of approximately ä   9,700 LF of earthen levee
  •                                                                                  ä      750 LF of MSE wall
  •                                                                                  ä   1,155 LF of concrete floodwall


  •  o  Fernville-side project consists of approximately ä  7,200 LF of earthen levee
  •                                                                                        ä     710 LF of MSE wall
  • Construction type is a function of real estate impacts, available land, and costs.
  • Typically, earthen levee costs < MSE wall costs < concrete or H-pile wall
2
BLOOMSBURG
FEASIBILITY STUDY

Recommended Plan: Total Project Cost*
  • Relocations                                                 $   6.3 million
  •              Fish & wildlife facilities                                   1.9 million
  •              Levees & floodwalls                                      24.3 million
  • Cultural resources preservation                      .6 million
  • TOTAL CONSTRUCTION COST                  $33.1 million


  •               Lands and damages                                        6.5 million
  •   Engineering & Design                                     3.4 million
  •   Construction management                             3.2 million


  • TOTAL PROJECT COST                              $46.2 million


  • *escalated to mid-point of construction


3
BLOOMSBURG
FEASIBILITY STUDY

Project Cost-Sharing
  •  o  TOTAL PROJECT COST (TPC):  $46.2 million


  •  o  COST SHARING:  65% Federal, 35% non-Federal
  •           --  @ $46.2M     ä  $30    million  Federal
  •                                     ä  $16.2 million non-Federal
  •                                           -- PA DEP to provide 50% of non-Fed amount


  •  o  NON-FEDERAL SHARE consists of:
  •           -- 5% (minimum) of TPC in cash
  •           -- All real estate costs
  •           -- All utility relocation costs