1
|
|
|
2
|
- Environmental resources
- River and Creek
- Wetlands
- Wildlife & Fish
- Agricultural Lands (including Prime and Unique)
- Sediment and Erosion Control/Water Quality
- Potential contamination issues
|
|
3
|
- McClure House
- Magee Mansion
- Fair Week
- Fairgrounds
- PA Canal, Lock and Lock Tenders House
- Water Treatment Plant Building and Pump
- Boones Dam
- Remaining Archeological Resources
- Remaining Process
|
|
4
|
- Susquehanna River
- Warm Water Fishery
- Several ecosystem stressors (AMD, other pollution)
- Other encroachments over time
- Still in moderate condition by PA (not impaired)
- Little impact from project on floodplain or channel
|
|
5
|
- Fishing Creek
- Managed by PAF&BC as warm water fishery in lower segment, Trout
waters upstream of Light Street
- ½ mile of lower segment being riprapped
- Impacted similarly by the WPA project in the late 30s
- Construction along either bank, trying to avoid creek impacts, some
along edge of creek, both banks
- Mitigation needed for Impact to creek ecosystem
|
|
6
|
- Wetlands
- Several types (forested, emergent, shrubby)
- Several functions (WQ, Flood attenuation, etc.)
- Impact to emergent wetlands by Fairgrounds (0.7 acres)
- Impact to forested wetlands along Fishing creek-approximately 2 acres
- Mitigation needed-Avoid, minimize, compensate
- Agencies have conducted field visits
- Goal is to replace lost functions
|
|
7
|
- Fish and Wildlife
- Have coordinated project with USFWS, PFBC and PAGC as well as other
agencies on the ground.
- Typical F&W resources in project area
- No threatened or endangered species
- Goal is then to minimize overall disruption
- F&W corridors and habitat will experience some impacts (noise,
sedimentation, thermal)
- USFWS and others will comment on DEIS
|
|
8
|
- Agricultural Lands
- Impacts- Approx. 12 acres of Tioga soils
- Coordinating with NRCS office-Ag Rating Form
- Minor impacts to current agric. operations
|
|
9
|
- Sedimentation and Erosion Control
- PADEP Requirements will be used
- E&S plan and permit will be obtained prior to construction
- Temporary increase in turbidity during construction
|
|
10
|
- Presence of Potentially Contaminated Material
- EPA and PADEP regulations apply
- An initial round of testing has been done
- Some contaminated material has been identified near the old landfills
- Additional, focused testing will be conducted at beginning of the
design phase
- Some potential that the alignment will be adjusted near old landfills
(to avoid contaminated soil and debris), primarily due to geotechnical
requirements.
- Low risk to community.
|
|
11
|
- Above ground and below ground resources
- Historic structures- 500 year floodplain
- McClure House, Magee Mansion, Water treatment plant, etc.
- Archaeological resources
- Arrowheads, shards, canal, lock and house, other foundations
- Cultural compliance work continues
- Phase I, II and III
- Partly through Phase I-PHMC (SHPO)
- Low risk to resources and project
|
|
12
|
- District anticipates no adverse effect on cultural resources
- Field work to be done in March-May timeframe
- Phase I work will determine need for any Phase II
- Phase II would be done just after Phase I
- McClure House-No impact
- Magee Mansion-No impact
|